Construction project of 150 cubic meters wastewater treatment plant in Yas Welfare Complex day and night

Petro Sazeh Beinolmelal Aram Engineering Company (IPS) during the contract with Bank Mellat in December 2017, constructed the wastewater treatment plant of Yas Educational-Welfare Complex located in Mazandaran province, Noor. The design of this project is in two phases of 75 cubic meters and completely independent of each other. According request of the Environment Organization, General Directorate of Engineering and Construction of Bank Mellat because of a wide range of pollutants in wastewater that could not be remove by using a limited number of treatment methods, tender this project. And IPS company as a tender winner got this project. Construction of wastewater treatment plant according to time schedule table will be finish and operational second half of August 2020.

Leave a Reply

Your email address will not be published. Required fields are marked *